Dedicated contact, short lines
For every project you get a dedicated contact in our office, with a direct line to the engineers running the calculations — fast response and short decision lines.
VaCro-GSA designs retaining systems, pile foundations and slope stability for contractors, architects and developers across Belgium. Pragmatic, fast and in line with the applicable standards and guidelines.
For every project you get a dedicated contact in our office, with a direct line to the engineers running the calculations — fast response and short decision lines.
All calculation reports follow EN 1997-1 (Eurocode 7) with the Belgian National Annex. Ready for review and permits.
First a quick indicative sizing for tendering, then the definitive study. No surprises.
Execution drawings, sections and — when needed — site visits. We think with the contractor.
One logic: soil parameters, loads, deformations — and the right technique for your situation.
Vertical steel soldier piles with timber, concrete or steel lagging between them.
Learn more
Continuous row of bored concrete piles — secant (temporary water cut-off) or tangent (above the water table).
Learn more
In-situ soil-cement wall built up from panels (CSM) or overlapping columns.
Learn more
Reinforced-concrete wall cast in the ground — permanent retention, water cut-off and bearing.
Learn more
Soilcrete columns formed by jet grouting — used as a retaining wall or as a load-bearing pile, also under existing foundations.
Learn more
Steel sheet piles for permanent or temporary earth retention and water cut-off.
Learn more
Deepening existing foundations — masonry underpinning up to 1.2 m or shored shafts for greater depths.
Learn more
Bored, driven, screw, displacement, grouted and micropile design to Eurocode 7.
Learn more
Stability analysis of new or existing slopes, embankments and excavations.
Learn moreFull study to Eurocode 7 with earth and water pressures, stability checks, deformations and internal forces.
CAD plan with pile and wall positions, anchor lines, levels and construction phasing.
Type sections per retaining system with dimensions, profiles and reinforcement details.
Execution folder for the contractor — pile schedule, phasing plan and details.
Send us your CPT report and a sketch — we get back to you within 48 h with a proposed approach.